Installation of all SAPN 11kV and 66kV SAPN services was managed by Vince Petruzzella through the north south corridor whilst working for the Torrens to Torrens Alliance including multiple Substations (Hackham & Mt Barker) whilst working for York Civil. Multiple project management delivery of numerous SA Power, Enerven fibre works throughout South Australia.
Installation of all DIT CST services between Torrens Road and Port Road managed by Vince Petruzzella whilst working for the Torrens to Torrens Alliance. All works from service locations, removal of existing, installation of ducting including all cable haulage and commissioning activities through to AS3000 install and light pole energising along the surface roads.
Installation of all DIT traffic signal reticulation (including footings and pole erection) & commissioning of Port Road intersection, Hawker Street intersection & Torrens Road intersection was managed by Vince Petruzzella whilst working for the Torrens to Torrens Alliance. Major traffic switch shutdowns were required from Friday evening through to Monday morning with back-to-back shifts on an hour-by-hour schedule.
Treo Civil installation of sewer/watermain on subdivision and private developments accross South Australia. Heavy client and resident liaisson was required through the area to ensure minimal to no disruptions on local functionality of existing systems. Assisting with pump station installation/fitout and pressure testing of systems prior to Client handover.
Project Management and Engineering delivery of Bolivar Waste Water Treatment Plant Anoxic Selector rehabilitation for SA Water. Involved management of Subcontractor to blast highly degraded 6 large tanks with acid attacked concrete, remorter and apply a Polibrid 705E coating. Vince Petruzzella managed this project whilst working for York Civil.
Water main and pump station chamber engineering management whilst working on T2T project. Vince Petruzzella delivered this portion of water main from design, installation, hanging under bridge, pressure testing and concrete pour tie in and commissioning.
Successful delivery of multiple stormwater projects around South Australia. Minimising impact to flow of traffic and ensuring adequate drainage throughout construction activities was maintained. A-class finishes on jointing, mortar and headwall rip-rap dressing.
Installation of pre-cast substation pad and til up panels to shield transformers from eachother in line with design. Main slab was poured, with formed piers to house transformers. Slab to incorporate drainage and conduit placement in positioning for transformer lead-ins. Sump drainage with oil seperator also installed.